Insight Technologies

Durham Region Admin

CLIENT

Region of Durham

LOCATION

Whitby, ON

ARCHITECT

Brisbon Brook Beynon

ENGINEER

The Mitchell Partnership

PROJECT TYPE

Design Build

COMPLETION DATE

June 2005

PROJECT VALUE

$57,300,000

Description

The amalgamation of 13 Durham Region departments was a driving factor in the design and construction of this six story 345,000 sq. ft. facility. Police Services, Provincial Offenses, Court Services, Social Services, Economic Development, Clerks, Finance, Planning, Information Technology, Tourism and Works have all been headquartered in this state of the art facility. The facility is also home to the Council Chambers and all the headquarters are tired to a central galleria. The Insight Team was responsible for the pursuit, design and construction oversight.

Features

Integrated stack economizers used to recapture waste heat lost and reduce the environmental impacts
The project is designed using Class “A” mechanical systems, achieving extremely high energy efficiency at price levels similar to typical suburban office space.

Central water cooled chillers provide chilled water to VAV compartment units on each floor, and central boilers serve perimeter heating needs.

N+1 redundancy for cooling serving critical IT infrastructure.

Demand controlled ventilation based on occupant load is integral to the design to conserve energy under partial occupancy conditions.

Fan-powered boxes help create superior indoor air quality by providing consistent fresh air, and at the same time reducing net energy consumption.

Knowledge Performance Integrity

About us

Find out what Insight Technologies can do for you. Get in touch with us today.

  • 6817 Steeles Ave West Toronto, Ontario M9V 4R9
  • 416-745-8228

Contact us

Send