Stiller Centre for Technology Commercialization

CLIENT

University of Western

LOCATION

London, ON

ARCHITECT

Marshall Macklin Monaghan

ENGINEER

Smith Carter

PROJECT TYPE

Design Build

COMPLETION DATE

September 2003

PROJECT VALUE

$17,800,000

Description

Part of Western University’s technology incubator Research Park, The Stiller Centre has both lab facilities and general purpose office spaces.  The three floor, 46,000 sq. ft. building facilitates entrepreneurship for biotech startups. The facility includes 14,000 sq. . ft. of ‘Level 2’ biohazard wet lab facilities that have a direct line to emergency services. The balance of the building is split between dry labs and general office space, including a 1,920 sq. ft. area of convergence laboratory. The Insight Team was responsible for the pursuit and construction oversight.

Features

The building has 100% heated/cooled make-up air, medical vacuum pumps, reverse osmosis water system and a DDC control system

Onsite Recycling Facility and Waste Generator

All systems critical have been connected to an emergency generator

Mechanical systems have been designed to accommodate variable laboratory layouts dependent on tenant demand

Knowledge Performance Integrity

About us

Find out what Insight Technologies can do for you. Get in touch with us today.

  • 6817 Steeles Ave West Toronto, Ontario M9V 4R9
  • 416-745-8228

Contact us

Send